US Navy second Land Craft Air Cushion LCAC 101 completes acceptance trials

According to information released by the U.S. Naval Sea Systems Command on June 16, 2020, the U.S. Navy’s next generation landing craft, Ship to Shore Connector (SSC), Land Craft, Air Cushion (LCAC) 101, concluded acceptance trials the week of June 8, 2020, after successfully completing a series of graded in-port and underway demonstrations for the Navy's Board of Inspection and Survey (INSURV). Read full Naval News at this link ...
The U.S. Navy’s next generation landing craft, Ship to Shore Connector (SSC), Land Craft, Air Cushion (LCAC) 101, concluded acceptance trials the week of June 8 after successfully completing a series of graded in-port and underway demonstrations for the Navy's Board of Inspection and Survey (INSURV). (Photo by Textron (courtesy of)/RELEASED)
Read More


Related Posts

There is no other posts in this category.
Subscribe Our Newsletter